Monday, October 31, 2016

FDOT District Four: Project Development and Environment (PD&E) Study for I-95 Interchange at 6th Ave. South

For more information use this link.

"The purpose of this study is to identify short-term and long-term needs and develop design concepts to address traffic spillback onto I-95, improve interchange operations, reduce congestion, and increase safety at the study interchange. The proposed improvements will address pedestrian and bicycle modes and will ensure that the project corridor continues to meet mobility and safety goals as travel demand continues to grow."

Completion Date: September 2017
Cost: To be determined
Lengths and limits: Approximately 0.7 miles along I-95 from north of 12th Avenue South to south of Lake Worth Road and approximately 0.5 miles along 6th Avenue South from Michigan Avenue to South C Street