As a follow up to the Town’s May 29, 2014, press release, Lake Trail is closed from Plantation Road to Via Marila through November 1, 2014, for the E-3 Force Main Project contingent on delays due to unforeseen conditions. The work involves rehabilitating the existing force main and manholes along Lake Trail.
Residents are asked to enter and exit Lake Trail at Plantation Road (south) or Via Marila (north).
The Town will issue periodic updates during the project to notify residents of the status of the trail.
Please use caution and read all construction signage when traveling along or near Lake Trail.
All questions and/or comments should be directed to contact the contractor representative Chase Rogers at (561) 640-3503 at Hinterland Group. The Town’s representative is Michael Roach, P.E., Project Engineer, who can be reached at (561) 838-5440.
Note: This is the bike/pedestrian trail that runs north of Royal Poinciana along the west side of Palm Beach Island along the Intracoastal Waterway. It is a popular destination for off-island people as well.