Click title for link to PBP article announcing a special City Commission meeting to discuss what appear to be "problems" with the casino building and pool. Problems, what problems? The meeting is scheduled for this Tuesday at 6 p.m. Make sure to check out the back-up material - especially the revised seven page long punch list of items on pages 11 through 17. The initial punch list is dated July 27, 2012.
Below is the list of deficient items in just the ballroom space:
Ballroom 2.03
100. Air Conditioning not working at the time of this inspection. It was 87 degrees in the
space.
101. Install missing panic hardware at door #203
should therefore have panic
102. Install missing astragal at door #203
103. Several doors have mismatched door sweep fasteners. Please match as required.
104. Seven (7) Ceiling access panels on the west side of the room appear to be warped
Address the door/framing system of the panel doors.
105. Adjust the smaller ceiling access panels. The doors do not appear to close properly.
106. There appears to be numerous (at least nine (9)) small holes drilled in the wood floor
along the eastern portion of the space. These appear to be air holes drilled in the floor to
allow moisture to escape from under the wood flooring. These floor boards ne
replaced.
107. Pair of doors #203-13 has two (2) holes drilled into the top of the door stiles.
Repair/replace doors as required.
108. Replace corroded exterior door pulls at pair of doors #203.13.
109. Address the numerous gaps at the perimeter of the floor/wo
in paint finish.
110. Wainscoting butt joints are inconsistent throughout the space. The appearance of the
inconsistencies needs to be addressed.
111. Retouch wainscot stain finish at the N/W corner of space.
112. Replace header door trim above door #203