Tuesday, February 12, 2008
Truth Matters Show - Already Archived
Truth Matters Show Tonight - 8 to 9 p.m.
You can click here to listen to the show.
I also called into the Lunch Box Show today and chatted with Jim Stafford regarding CRAs and their role in redevelopment. You can click here to hear that show as Jim has already archived it (it's at the top of list on the player).
Hope you can take time to listen tonight!
Monday, February 11, 2008
Extension Service Offers Course Exploring Natural Resource Issues
Palm Beach County Extension and Palm Beach Community College (PBCC) are teaming up to provide an exciting non-credit continuing education course on South Florida natural resource issues. Environmental professionals new to Florida and all interested citizens who would like to learn about natural resource issues in a fun and discussion-oriented classroom are invited to attend. Each class will be devoted to a specific natural resource topic. During the 6-week course, participants will interact with guest speakers and participate in class discussions.
Here is the class schedule:
March 29: Introduction to South Florida
April 5: Loxahatchee River
April 12: Wildlife Habitat Fragmentation
April 19: Surface Water Quality
April 26: Water Use and Reclaimed Water Systems
May 3: The Rural Urban Fringe
What: Natural Resource Issues Facing South Florida, Part II
Where: Palm Beach Community College, Palm Beach Gardens Campus
When: Thursdays, 6:30 p.m – 8:30 p.m.
March 29 th through May 5, 2007
Registration Fee: $60 (course ID is ORO 0208; Reference #097940)
All course materials are included in the $60 registration fee. Register on the web at: http://www.pbcc.edu/cce.xml, at any PBCC campus, or phone PBCC at 561-868-3700.
For more information contact Alyssa Dodd, Agricultural and Natural Resources Extension Educator, Palm Beach County Extension, 561-233-1725 or email her at ADodd@ifas.ufl.edu
Reading about the 3 x 4 foot park...
Let's also establish a public information officer in the City of Lake Worth. Maybe that's what is needed to get the good news out about what is happening here in our city.
Sunday, February 10, 2008
Green Residential Rehab - Part 1
These are a pair of nicely produced videos. Not all of these techniques and technologies apply to our South Florida climate, but the principles are generally the same.
Beyond Walls: GreenThink in Lake Worth
But most significantly, it represents the first steps to a very bright green future in Lake Worth!
It is clear that this will be a working prototype of new LEED certified construction that will attract school age children and adults alike. They will come to study this building and learn the importance of environmentally friendly design. This will spawn other buildings that can take advantage of the lessons learned from this project and apply the technology/techniques in their projects.
The most important aspect of this building being located here is that it is symbolic of the GreenThink for which our own Lake Worth can be known. Already this is starting to manifest itself. I recently finished working on the grant application for the Hammon Park residential project that will provide workforce housing in our downtown area. During the public meetings discussing the changes necessary for the project to go forward, the Romano Group generously offered a program where the firm would provide down payment assistance to their employees if they were to purchase a home in Hammon Park. John Szerdi's firm, Living Designs, has also stepped up to the plate and offered a similar benefit to their employees.
This is the power of GreenThink - beyond the physical walls of a building.
Why is this so important? First of all, it is rare for the private sector to step up to the plate in this manner, but it's probably the beginning of a trend as new, quality housing physically near your place of employment is almost impossible to find. But it is becoming more and more important as the price of gas increases, threats of climate change loom and an increasing cost burden on the part of the household for reliable transportation is experienced by many households. Clearly, it will be more and more desirable to locate near where you work as commuting has been shown to be the major contributor to the large carbon footprint left by most middle class families.
We also must not forget of the coming transit service on the FEC (eastern) railroad tracks that will make commuting to other coastal downtowns easier and more accessible today. Tri-Rail is fine for longer distance commuting, but it is too far west to benefit the bulk of the population east of I-95.
Lake Worth is also a very bikeable and walkable community. We also have a "grid" street pattern that has been the rage of "new urbanism" planning doctrine. We are actually what all the new communities which call themselves "Tradition" want to be - without trying. And we can do so in an environmentally sound planning paradigm - encouraging in-fill development of all sorts within the borders of our community. Our new Comprehensive Plan and Zoning Code will support this effort.
For this reason, I feel that the future is bright and green in Lake Worth. You just wouldn't know it by much of the negativity that surrounds public debate here. We are likely going to succeed in spite of ourselves. Imagine how much better and faster that could happen if we learned to get out of our own way!
They say if you love something, let it go. I say if you really love this City, let go of selfish ambitions and let Lake Worth be what it can and should be.
One of the ways we can do that is through GreenThink. It is the key to our future. More later.
Saturday, February 9, 2008
Emerging EcoCentre in Lake Worth


This is such a great accomplishment - being completed right now within the City of Lake Worth. This year, I have re-joined the board of the Palm Beach County Planning Congress. We are currently planning an event and educational tour of this building as part of a special program on green building construction and design in March. I will provide further details as they come together. The outing will include a tour of this magnificent building and an informative talk by John Szerdi, project architect. Below are some of the features employed within and a part of this building.
Green and Living Features:
1. Seeking Gold LEED Certification
2. Living “
3. Raised flooring system efficiently delivers air conditioning with individual thermostats for all offices.
4. LEED compliant dismantling of existing building
5. Living Machine® designed to purify & recycle greywater on site for exterior irrigation
6. Building is lush with indoor landscaping
7. 12’ Waterfall and pond water supplied by harvesting air conditioning condensate
8. Operable windows for each office
9. FSC (Forest Stewardship Certified) wood used
10. Ice stone countertops made of recycled crushed bottled glass
11. Extensive use of natural lighting
12. Vegetable-based oil for elevator piston system
13. Energy-efficient lighting system with occupancy sensors for each office
14. Central atrium or “Biolarium”
15. Exterior includes recycled "Chicago Brick"
16. Environmentally friendly paints, sealants and adhesives
17. Environmentally friendly furniture
18. LEED compliant floor covering
19. Garage plug-in for electric car
20. Bike rack on premises
21. Waterless urinals
22. Water conserving fixtures
23. Fully equipped health gym
24. Water-efficient landscaping
25. Construction recycling
26. Non-smoking building
Palm Beach County’s first green, “living” office building
coming to historic
[
According to Nancy Romano, President of Vive Verde, Inc., owner of EcoCentre, the Living
Building, “Can you imagine a society in modern times where we construct beautiful, livable, and
The lead architect on the project is John Szerdi of Living Designs Group, LLC of Boynton Beach, Florida, and
“The basis for a ‘
“The client in this instance requested an equitable and livable work environment for everyone in the firm. The site and special program posed stimulating challenges which inspired us to turn the common office building design response inside out. That is, instead of placing a compact building form on an urban site and surround it with the obligatory perimeter landscape strip, we have decided to bring many of the natural elements inside and ‘on top.’ This eliminates interior work spaces totally dependent upon artificial lighting (which is typically for the less fortunate or less senior staff in most projects).
“This premise is the foundation for the design organization of the site and the integration of Living Designs Group’s ‘
“Here are just some of the roles these systems will play in EcoCentre, the
a) A Biolarium space with cubic proportions will be created by wrapping a 25’ wide ribbon of office spaces and other uses. All spaces will be accessed from this space which will contain crucial visual, thermal, and acoustical systems for the pleasure and comfort of all other spaces.
b) The perimeter spaces not only insulate the Biolarium or atrium-like space but assure all occupants of views to nature or the city. Natural daylighting will reduce energy costs of artificial lighting and provide workers with the full spectrum of light. Artificial lighting will be activated by sensors for general lighting with desk or floor lamps for task lighting as desired.
c) The juxtapositioning of the work and work-related spaces at each level will allow fresh air and people into the Biolarium from the north of
d) The upper level gardens and ‘living roof modules’ will capture storm water and provide the filtration of the water which will be stored in an 8-thousand-gallon cistern located beneath the covered parking. This water will be used for toilet flushing, dramatically reducing the potable water consumption for this building while keeping the roof cooler.
e) The ‘Living Machine®’ located on the second floor of the Biolarium will treat grey water from the building occupants (lavatories and showers) and be re-used for irrigation, further reducing potable water consumption in the building. Waterless urinals will be used in the men’s bathroom. The kitchen will be the hub of recycling materials. Food and the water cooler are social connectors at work.
f) The Biolarium space becomes a ‘sponge’ for the incoming fresh air and a water source for the pond located in the entry at street level. The condensate may capture as much as 250-300 gallons of water a day and will be used for all the indoor irrigation needs. The indoor plants will absorb CO2 from the building occupants and contribute to the healthy fresh air being circulated back to the offices through the Biolarium (the lungs of the building).
g) The raised flooring system in the building will locate modular motorized air dampers in each office that opens and closes at the control of the occupant via separate thermostats. Individual controls have been proven to save substantial energy while giving everyone a comfortable space to work. The system will maximize the efficiency of air conditioning and air flow,
while also providing ongoing flexibility for the movement of electrical outlets, air flow vents, and easy/ready access to wiring systems without requiring remodeling or discarding any equipment or materials.
h) Cooling loads will be reduced because of the thermal absorption of the roof top and balcony gardens and ponds. A highly thermal resistant (R-30) curtain wall system will significantly reduce cooling loads and almost eliminate any heating needs to but a couple days a year.
i) Ninety percent of the on-site parking is covered by the building creating a shaded area reducing heat island effect that typically radiates energy from the exposed cars and parking surfaces back into the microclimate of the city.
j) All landscaping will be provided with re-use water and delivered via subsurface irrigation system to minimize evaporative loss and maximize water efficiency. Biolarium landscaping will provide a constant connection with nature and reduce CO2 concentrations in the building.”
The integration of these systems becomes the recipe for a healthy, pleasant “living environment,” a concept that makes EcoCentre, the
“EcoCentre, the
It is designed to be a 33,000 gross sq. ft., four-story office building with garage parking and two retail
flowing onto it from the second floor above. The second, third, and fourth floors will contain office space and views into the center of the building looking into the Biolarium, gardens, streams and
waterfall. The building will be topped with a “living roof” rich with plants, trees, gardens, and sitting and viewing areas.
Thomas E. Worrell, Jr., principal owner of Worrell Water Technologies, LLC and Dharma Properties, states, “Imagine the fusion of art, nature, and technology. Imagine living alternatives and business office settings which are elegant and responsible. I believe it is important for our health and our soul to invite nature into our lives. We believe in harnessing the vigor of biology to cleanse our water without harming the environment. EcoCentre, the
Other features in this extraordinary project will include such things as the following:
1. A mock trial courtroom with jury facilities;
2. A full, complete and state-of-the-art video conference center;
3. An exterior made of recycled
4. Countertops which look like marble but which are made entirely of recycled materials – primarily crushed bottled glass and environmentally sensitive concrete to mimic real marble;
5. A view for all building personnel of “both” the interior Biolarium and gardens and outside;
6. A state-of-the-art workout gym and fitness center;
7. The piston system operating the central elevator will use a technological innovation form of operating oil which is “vegetable based;”
8. The furniture throughout the building will be made primarily from either recycled and reused materials or from lumber which is Forestry Services Certified (coming from “select cut” forests) as opposed to “clear cut” forests;
9. The interior drywall will be made from recycled and reused products.
The main office occupant of the building will be the renowned trial lawyer firm of Romano Law Group. John F. Romano, a partner in the firm and former President of the
Tentative/interim timetable:
April 11, 2005 – Building vacated by law firm.
April 12 – May 23, 2005 – Building to be utilized by local law enforcement and related agencies, including Lake Worth Police Department, Lake Worth Fire Department, and Palm Beach County Sheriff’s Office for practice and rehearsal sessions, hostage rescues, fire curtailment, etc.
May 24 – September 15, 2005 – “Dismantling” followed by demolition (with actual demolition to commence in August 2005). This “dismantling” includes removing all items in or on the building which can be reused and/or recycled. The dismantling procedure requires observation and log documentation for LEED purposes.
July 2006 – Groundbreaking; construction commences
May, 2008 - Target construction completion date
June, 2008 – Move into building
December 4, 2008 – Grand opening celebration and events
This is how the building looked about two weeks ago. It can be seen at the south west corner of Lake Avenue and H Street.
A little more clarification re the previous post...
And, instead of asserting a leadership role that "gets us all talking again", the District #3 Commissioner voted against the changes of the wording in the agreement as somehow she thinks...?
Well, what could she be thinking?
I would like to see some sign of original thought coming from this Commissioner (I know she is capable of this) that upholds her duty to protect the City's financial and legal interests (not a select few of her supporters).
As far as Commissioner Jennings, who voted the same way, that is something we have come to expect from her anyway. One need only to read today's Palm Beach Post article to have an understanding of her motivations.
Wednesday, February 6, 2008
Commission Approves Changes in GB Agreements...
Here was the perfect chance to protect the city's interests by eliminating the cause of a lawsuit. This commissioner wanted the lawsuit and the attorney fees to continue stopping progress on beach improvements. Is that showing fiduciary responsibility?
I guess the puppeteers are taking turns at the reins:
Tuesday, February 5, 2008
Reciting Facts:
Person A - I am surprised with you. You are an intelligent person and should be able to separate fact from fiction. But I will give you credit for helping create the myths that propel some of the decisions being made in this City - on both sides of the dais.
Re the Smith property, per the latest Judge's ruling, the property has not been rezoned and retains it County zoning designation. Had it been rezoned to the City category of MF20, doing the math results in the possibility of 80 units. That was not an acceptable outcome. The P&Z and the Commission also required that the property owner enter into to an agreement with the City to limit development to 10 units an acre, along with other very important conditions. Those conditions run with the land. Without that agreement, they would not have had my vote. Nothing has been built there. The property owner still needs to come back and go through the site plan review process and ask for a special exception to build townhouses. That is not likely to happen in this market and may be years off. My prediction: The property will be de-annexed into the County and we will have less control over what happens on the property over the long term. We have already seen the confusion possible with public safety calls in your neighborhood where it is not clear, in panic situations, what is in and out of the city limits.
You know, I would really like to sit down with you and go word-by-word through the Beach and Casino zoning district. Whatever is NOT identified as a permitted use cannot be built - period. The proposed zoning for the beach is not broad at all. It is one of the most restrictive in the city. People look to you as an informed person and it concerns me that you could easily mislead people through material misrepresentation of the facts.
The city has turned down variance requests before. If you like, I can look up as many examples as it takes to satisfy your curiosity.
Greater Bay cannot "flip" the property to anyone without the approval of the City Commission. The City Commission and the Department of Community Affairs would have to approve any further change in the future land use or zoning for the property - if the project were to be transfered to another entity and they wanted to do something different than what the zoning would allow. By the way, nothing like that has been proposed.
We would not have to acquiesce to anyone regarding the zoning of the property. There is no "dirty little secret."
The City has turned down condos and hotels at the beach. The proposed Beach and Casino zoning district doesn't allow either of them. The former Mayor that you mentioned was the FIRST one to rule out a hotel at the beach as part of those proposals when it got to the City Commission. I have a copy of a Palm Beach Post article if you would like to read it that says so.
No one will be able to build a condo or a hotel, period.
Person B- At one moment you suggest that the CRA should expand its boundary to include the beach and in the next accuse the CRA of wasting money. I believe the reason that the beach was not included in the CRA was that it wasn't a source of a significant tax base generation for use in tax increment financing.
I agree that the City Commission and Mayor take the easy way out on many issues in our city. Unfortunately, the millions in waste you talk about (and I have no doubt that the figure is higher) is just that - wasted. Unidentified and uncontrolled spending has set this city back in many ways - but that mis-spent money cannot be retrieved. It's gone. I had an idea that we identify all the "savings" from instituting a special fund we could dump this "found" money into, but that just is not how city budgeting works.
Have a nice day.
